Eliminates
cable replacement |
| >> |
Eliminates
customer interference |
| >> |
Minimizes time to achieve reliability |
| >> |
Minimizes service interruptions |
| >> |
Minimizes
disruptions to landscape and pavement (for direct buried cables) |
| >> |
Minimizes burden on engineering and construction |
| >> |
Pair recovery from crosses, shorts and grounds |
| |
|
|
|

| |
|
CableCURE® CB fluid, injected directly into the cable, pushes
the water out and thickens to a re-enterable gel within 48
to 72 hours-so you can get in
if you need to, but water can't. As a result, it extends
the cable's life indefinitely, precludes any future problems
from water damage, and eliminates
the need for premature cable replacement.
|
|